跳到正文
研踪PaperTrail

论文库

检索计算机领域论文,按研究方向、作者或关键词筛选。

部分采集异常
正在读取账号与研究记录…

全站更新概况

+0新增论文
+0其中 AI 相关
+0已有论文修订
+100新增 AI 导读

arXiv 最近完成扫描:2026-11-15 19:05 · 全站最近入库:2026-11-14 15:09各信源进度 →

统计口径与数据新鲜度

统计 2026-11-14 20:02 — 2026-11-15 20:02(北京时间) · 点击数字查看对应简报;AI 相关包含在新增论文内。

最近完成检查:2026-11-15 19:05最近发现新增版本:2026-11-14 15:09库内论文最新更新时间:2026-11-13 02:59

每分钟刷新已保存的数据。空检查不代表采集异常;新收录可能包含历史论文。AI 导读按新增版本计数。

23,348 已收录论文19,580 AI 相关6,729 有修订112 HF 社区发现

浏览论文库

时间范围跟随排序:版本更新、本站收录或首次发表。最新收录可能包含历史论文。部分信源异常,查看状态 →

找到 1 篇论文 · 按版本更新时间排序上轮扫描起点 2026-11-15 19:03(北京时间)
新论文 · v1arXiv:2610.40444

前缀可执行性:超越最终成功评估工具使用智能体

Prefix Executability: Evaluating Tool-Using Agents Beyond Final Success

Amir H. Rezaeian, Weiyi Sun, Yassine Benajiba, Dan Roth

AI 速读 基于摘要

提出以工具调用序列每个前缀是否可执行来评估工具使用智能体的轨迹级协议,并指出仅看最终成功率会掩盖执行轨迹中的失败模式。

cs.AI · cs.CL

查看原文摘要

Tool-use benchmarks often score agents by final task success, but terminal outcomes can obscure whether the intermediate tool-call trajectory was executable. We propose prefix executability as a trajectory-level evaluation protocol for tool-using agents. The protocol measures whether every prefix of a predicted tool-call sequence remains executable under tool schemas, state preconditions, and data dependencies, and summarizes reliability using Prefix Executability Curves (PEC), First-Error Depth (FED), Trajectory Executability Rate (TER), horizon-normalized AUC-PEC, and Recovery Rate (RR). We instantiate the protocol on stratified samples from BFCL-v3 multi-turn and ToolSandbox, and on the complete Airline/Retail base splits of $τ^3$-bench. We observe that outcome-only and prefix-level rankings diverge: agents whose execution is conditioned on an unverified plan often achieve higher point-estimate final success than non-plan-conditioned baselines while substantially lowering TER and AUC-PEC. These divergences are precisely the failure modes that prefix executability is designed to expose: they reveal whether apparent success rests on an executable trajectory, where invalidity first enters, and whether success follows recovery from an earlier failure. As a validation intervention, explicit pre-execution plan checking can improve executable-prefix survival while maintaining competitive terminal success. These results show that final success alone is insufficient for evaluating tool-use agents and that prefix-level executability provides an actionable reliability signal for comparing agents, diagnosing failures, and assessing validation mechanisms.