跳到正文
研踪PaperTrail

论文库

检索计算机领域论文,按研究方向、作者或关键词筛选。

部分采集异常
正在读取账号与研究记录…

全站更新概况

+0新增论文
+0其中 AI 相关
+0已有论文修订
+100新增 AI 导读

arXiv 最近完成扫描:2026-11-15 19:05 · 全站最近入库:2026-11-14 15:09各信源进度 →

统计口径与数据新鲜度

统计 2026-11-14 19:22 — 2026-11-15 19:22(北京时间) · 点击数字查看对应简报;AI 相关包含在新增论文内。

最近完成检查:2026-11-15 19:05最近发现新增版本:2026-11-14 15:09库内论文最新更新时间:2026-11-13 02:59

每分钟刷新已保存的数据。空检查不代表采集异常;新收录可能包含历史论文。AI 导读按新增版本计数。

23,348 已收录论文19,580 AI 相关6,729 有修订112 HF 社区发现

浏览论文库

时间范围跟随排序:版本更新、本站收录或首次发表。最新收录可能包含历史论文。部分信源异常,查看状态 →

找到 1 篇论文 · 按版本更新时间排序上轮扫描起点 2026-11-15 19:03(北京时间)
新论文 · v1arXiv:2611.03381

A Geometry-Informed Neural Operator surrogate of LISFLOOD-FP for rapid pluvial-fluvial flood forecasting: the case of Forlì, Italy

Samuele Maria Garofalo, Fabio Limardo, Simonetta Bodojra, Mohammad Amin Nabian, Mehdi Taghizadeh

原文摘要

Physically based two-dimensional hydraulic models are too slow for real-time inundation forecasting and large ensembles. We present a time-dependent geometry-informed neural operator (GINO) surrogate of LISFLOOD-FP for the municipality of Forlì (Italy), severely affected by the May 2023 Emilia-Romagna floods. The surrogate is designed for an operational setting in which only river stage gauges and rain gauges are available. A reproducible pipeline turns public regional observations into a physically based training set: each river inflow is driven by the first stage gauge downstream of it through a calibrated water-surface boundary condition, and rain enters as SCS-CN effective rainfall. The surrogate is an autoregressive GINO trained on 216 simulations of 24 observed events with scaled forcing. It predicts volume-conserving polygon-mean depths on an exposure-based Voronoi mesh of 659 nodes, with a 20 min step over 72 h. The surrogate is tested on 38 independent observed events that it never saw during training. On these events it reaches a critical success index (CSI) of 0.934 at 0.05m and 0.844 at 0.3 m, a depth RMSE of 0.008m and an $R^2$ of 0.984 for maximum-depth maps. On one NVIDIA A10G GPU a 72-h forecast takes 1.7 s instead of 55 s with LISFLOOD-FP, and a 50-member ensemble, computed in a single batched rollout, takes 6.2 s instead of about 46 min, which makes probabilistic flood forecasting practical. These results show that neural-operator surrogates can deliver accurate pluvial-fluvial flood forecasts driven by river stage for operational early warning.

cs.LG · physics.geo-ph