跳到正文
研踪PaperTrail

论文库

检索计算机领域论文,按研究方向、作者或关键词筛选。

部分采集异常
正在读取账号与研究记录…

全站更新概况

+197新增论文
+151其中 AI 相关
+16已有论文修订
+91新增 AI 导读

arXiv 最近完成扫描:2026-11-21 12:19 · 全站最近入库:2026-11-21 12:19各信源进度 →

统计口径与数据新鲜度

统计 2026-11-21 04:02 — 2026-11-22 04:02(北京时间) · 点击数字查看对应简报;AI 相关包含在新增论文内。

最近完成检查:2026-11-21 12:19最近发现新增版本:2026-11-21 12:19库内论文最新更新时间:2026-11-20 02:59

每分钟刷新已保存的数据。空检查不代表采集异常;新收录可能包含历史论文。AI 导读按新增版本计数。

29,158 已收录论文24,181 AI 相关8,992 有修订112 HF 社区发现

浏览论文库

时间范围跟随排序:版本更新、本站收录或首次发表。最新收录可能包含历史论文。部分信源异常,查看状态 →

找到 1 篇论文 · 按版本更新时间排序上轮扫描起点 2026-11-21 12:17(北京时间)
新论文 · v1arXiv:2610.34708

Resource-Performance Trade-offs in Intra-Aisle Robotic Picking: A Discrete-Event Simulation Comparison of Shuttle Configurations With and Without an Onboard Tote Lift

Mohsen Reda Mahmoud Moursi

原文摘要

This study compares two implemented intra-aisle robotic-picking configurations through discrete-event simulation. Without an onboard tote lift, two level-captive shuttles serve the two tested levels; with the lift, one shuttle remains on its horizontal level and its onboard mechanism moves the order tote to allow picks from the adjacent upper level. Thirty configuration-task-size experiments (n = 1-15 locations; ten replications each) yield 300 replication-level cycle-time observations. Two-sided Welch tests are applied to the replication means, with Holm adjustment across the 15 comparisons. The onboard-tote-lift configuration has longer mean cycle time at all tested task sizes. At n = 15, the means are 299.477 and 333.231 s/cycle, respectively: a 33.753 s increase (11.27%). The corresponding cycle-time-derived item rates are 180.314 and 162.050 items/h (-10.13%). These rates are calculated as 3600n divided by the scenario-mean cycle time; they are not measurements of the combined concurrent capacity of two level-captive shuttles. Importantly, task locations are sampled from different eligible-level sets in the two configurations, so the result concerns the implemented configuration-and-task-generation packages, not the isolated effect of a five-second tote-lift operation under identical picked locations. The study quantifies a cycle-performance difference alongside a reduction from two dedicated shuttles to one within the tested two-level block; it does not quantify system-level maximum throughput, investment cost, or reliability.

cs.RO