跳到正文
研踪PaperTrail
← 研踪 PaperTrail

arXiv:2604.08242 · v6

Scheduling Coflows in Multi-Core OCS Networks with Performance Guarantee

首次提交 2026-04-09 21:32
版本更新 2026-11-07 15:52
雷达观测 2026-11-10 11:14
arXiv ↗PDF ↗

摘要

The coflow abstraction captures application-level communication patterns and enables coordinated scheduling of parallel flows to reduce job completion times in distributed systems. Modern data center networks (DCNs) are employing multiple independent optical circuit switching (OCS) cores operating concurrently to meet the massive bandwidth demands of application jobs. However, existing coflow scheduling research primarily focuses on the single-core setting, while studies of multi-core fabrics have largely considered electrical packet switching (EPS) networks. To address this gap, this paper studies the coflow scheduling problem in multi-core OCS networks under the not-all-stop reconfiguration model, in which the reconfiguration of one circuit does not interrupt other circuits. The challenges stem from two aspects: (i) cross-core coupling induced by traffic assignment across heterogeneous cores; and (ii) per-core OCS scheduling constraints, namely port exclusivity and reconfiguration delay. We propose an approximation algorithm that jointly integrates cross-core flow assignment and per-core circuit scheduling to minimize the total weighted coflow completion time (CCT) and establish a provable worst-case performance guarantee. Furthermore, our algorithm framework can be applied to the multi-core EPS scenario with a corresponding approximation guarantee for packet-switched fabrics. Trace-driven simulations using real Facebook workloads demonstrate that our algorithm can reduce the total weighted CCT and tail CCT.

作者备注:13 pages, 9 figures, 4 tables

AI 论文解读

基于摘要 · 非全文审阅

此版本尚未生成 AI 解读。解读由后台任务生成并按论文版本保存,登录后共享已有结果。

版本差异

本站首次收录为 v6,暂无更早版本可对照。

观测到的版本

相邻记录可能跳过中间版本;首次发现 v2 及以上也会标为版本更新。

v6 · 2026-11-07 15:52 · 最新观测版本

Scheduling Coflows in Multi-Core OCS Networks with Performance Guarantee

The coflow abstraction captures application-level communication patterns and enables coordinated scheduling of parallel flows to reduce job completion times in distributed systems. Modern data center networks (DCNs) are employing multiple independent optical circuit switching (OCS) cores operating concurrently to meet the massive bandwidth demands of application jobs. However, existing coflow scheduling research primarily focuses on the single-core setting, while studies of multi-core fabrics have largely considered electrical packet switching (EPS) networks. To address this gap, this paper studies the coflow scheduling problem in multi-core OCS networks under the not-all-stop reconfiguration model, in which the reconfiguration of one circuit does not interrupt other circuits. The challenges stem from two aspects: (i) cross-core coupling induced by traffic assignment across heterogeneous cores; and (ii) per-core OCS scheduling constraints, namely port exclusivity and reconfiguration delay. We propose an approximation algorithm that jointly integrates cross-core flow assignment and per-core circuit scheduling to minimize the total weighted coflow completion time (CCT) and establish a provable worst-case performance guarantee. Furthermore, our algorithm framework can be applied to the multi-core EPS scenario with a corresponding approximation guarantee for packet-switched fabrics. Trace-driven simulations using real Facebook workloads demonstrate that our algorithm can reduce the total weighted CCT and tail CCT.

查看此版本解读 →查看此版本原文 ↗