Comparative Analysis of Large Load Interconnection Requirements Across U.S. Transmission Entities

首次提交 2026-10-27 13:06
版本更新 2026-10-27 13:06
雷达观测 2026-10-29 00:35
arXiv ↗PDF ↗

摘要

The rapid growth of large loads, especially data centers driven by artificial intelligence, is creating unprecedented demands on the North American electric grid. Data centers now account for nearly 80% of large load interconnection requests in the Western Interconnection, and U.S. electricity consumption from data centers is projected to reach 325-580 TWh by 2028. Despite this urgency, technical interconnection requirements for large loads have not yet matured and still contain several gaps. This paper presents a comparative analysis of large load interconnection requirements across eleven U.S. entities, including AEP, Ameren, CAISO, Dominion, Duke Energy, ERCOT, LIPA, MISO, PJM, Southern Company, and SPP, under seven technical categories: large load definition, load data and modeling, fault ride-through, load curtailment and shedding, dispatchability, power quality, and reactive power control. The analysis reveals significant variation in both the scope and specificity of requirements. LIPA addresses all seven technical categories at least partially, while Dominion and Duke Energy provide detailed coverage across nearly all categories. The analysis also finds that data center applicants can be viewed as potential grid resources, rather than only as consumers. The findings provide a structured baseline from which utilities, regulators, ISOs/RTOs, and developers can identify gaps, benchmark against peers, and accelerate the development of interconnection standards.

期刊信息:CIGRE US National Committee 2026 Grid of the Future Symposium

AI 论文解读

基于摘要 · 非全文审阅

此版本尚未生成 AI 解读。解读由后台任务生成并按论文版本保存,登录后共享已有结果。

版本差异

目前只观测到一个版本,无法比较变化。之后收录新版本时,会在这里对照标题、作者、分类和摘要。

观测到的版本

相邻记录可能跳过中间版本;首次发现 v2 及以上也会标为版本更新。

v1 · 2026-10-27 13:06 · 最新观测版本

Comparative Analysis of Large Load Interconnection Requirements Across U.S. Transmission Entities

The rapid growth of large loads, especially data centers driven by artificial intelligence, is creating unprecedented demands on the North American electric grid. Data centers now account for nearly 80% of large load interconnection requests in the Western Interconnection, and U.S. electricity consumption from data centers is projected to reach 325-580 TWh by 2028. Despite this urgency, technical interconnection requirements for large loads have not yet matured and still contain several gaps. This paper presents a comparative analysis of large load interconnection requirements across eleven U.S. entities, including AEP, Ameren, CAISO, Dominion, Duke Energy, ERCOT, LIPA, MISO, PJM, Southern Company, and SPP, under seven technical categories: large load definition, load data and modeling, fault ride-through, load curtailment and shedding, dispatchability, power quality, and reactive power control. The analysis reveals significant variation in both the scope and specificity of requirements. LIPA addresses all seven technical categories at least partially, while Dominion and Duke Energy provide detailed coverage across nearly all categories. The analysis also finds that data center applicants can be viewed as potential grid resources, rather than only as consumers. The findings provide a structured baseline from which utilities, regulators, ISOs/RTOs, and developers can identify gaps, benchmark against peers, and accelerate the development of interconnection standards.