← 研踪 PaperTrailarXiv:2611.07520 · v1
Graph learning-assisted logic-based Benders decomposition for distributionally robust in-station train rescheduling under disruptions
首次提交 2026-11-05 14:30
版本更新 2026-11-05 14:30
雷达观测 2026-11-06 11:06
摘要
Uncertainty in resource reopening times complicates train holding and rerouting decisions when resource closures coincide with arrival delays and processing-time extensions. We develop a rolling-horizon distributionally robust model that updates predictions of the remaining closure duration as observations of disruption resolution become available. The model jointly optimizes train routes, sequences, and timings. It minimizes the worst-case expected total completion delay over an ambiguity set of scenario probabilities. The solution algorithm, GNN-LBBD, uses logic-based Benders decomposition to coordinate routing and resource scheduling. Conditional cuts are constructed from resource-use patterns, and a graph neural network guides the order in which resource relaxation subproblems are solved. Across 28 test instances for a five-track station, GNN-LBBD achieved a mean total completion delay of 61.13 train-min. This was 16.63\% lower than tabu search and 20.06\% lower than variable neighborhood search, with a mean total computation time close to that of tabu search. Information comparisons on six representative instances showed that using observations of disruption resolution reduced mean total completion delay by approximately 21.7\%. Scenario-based and conditional-mean predictions produced similar overall results under the same information conditions. The benefits of information were more pronounced in some instances with alternative routes. This suggests a relationship between the use of observations, the station resource structure, and the scope for schedule adjustments.
观测到的版本
相邻记录可能跳过中间版本;首次发现 v2 及以上也会标为版本更新。
v1 · 2026-11-05 14:30 · 最新观测版本
Graph learning-assisted logic-based Benders decomposition for distributionally robust in-station train rescheduling under disruptions
Uncertainty in resource reopening times complicates train holding and rerouting decisions when resource closures coincide with arrival delays and processing-time extensions. We develop a rolling-horizon distributionally robust model that updates predictions of the remaining closure duration as observations of disruption resolution become available. The model jointly optimizes train routes, sequences, and timings. It minimizes the worst-case expected total completion delay over an ambiguity set of scenario probabilities. The solution algorithm, GNN-LBBD, uses logic-based Benders decomposition to coordinate routing and resource scheduling. Conditional cuts are constructed from resource-use patterns, and a graph neural network guides the order in which resource relaxation subproblems are solved. Across 28 test instances for a five-track station, GNN-LBBD achieved a mean total completion delay of 61.13 train-min. This was 16.63\% lower than tabu search and 20.06\% lower than variable neighborhood search, with a mean total computation time close to that of tabu search. Information comparisons on six representative instances showed that using observations of disruption resolution reduced mean total completion delay by approximately 21.7\%. Scenario-based and conditional-mean predictions produced similar overall results under the same information conditions. The benefits of information were more pronounced in some instances with alternative routes. This suggests a relationship between the use of observations, the station resource structure, and the scope for schedule adjustments.
查看此版本解读 →查看此版本原文 ↗