跳到正文
研踪PaperTrail
← 研踪 PaperTrail

arXiv:2611.34869 · v1

Pinwheel Scheduling is PSPACE-Complete

首次提交 2026-11-26 02:34
版本更新 2026-11-26 02:34
雷达观测 2026-11-26 12:28
arXiv ↗PDF ↗

摘要

Pinwheel Scheduling is a classical periodic scheduling problem, receiving as input the deadlines did_i of nn tasks and asking for an infinite schedule with one task per time unit, such that every task ii is scheduled at least once in every did_i time units. Holte, Mok, Rosier, Tulchinsky, and Varvel introduced the problem in 1989 and showed that it lies in \(\PSPACE\). Its exact complexity has been open since then. \(\NP\)-hardness for explicitly listed deadlines was established only recently, and membership in \(\NP\) is open. In this work we prove that Pinwheel Scheduling is \(\PSPACE\)-complete when the deadlines are written in binary. This finally settles the long-standing open question about the complexity of Pinwheel Scheduling. We present a chain of reductions, starting from Periodic 3-SAT, a classical \(\PSPACE\)-complete problem, and using two newly-defined intermediate periodic scheduling problems. These intermediate problems can be seen as periodically assigning tasks to days, with each day containing a fixed number of slots (\emph{hours}) in which tasks are scheduled. In the first of these problems, each day is additionally allowed to contain \emph{breaks}, that is, hours in which no task can be scheduled.

AI 论文解读

基于摘要 · 非全文审阅

此版本尚未生成 AI 解读。解读由后台任务生成并按论文版本保存,登录后共享已有结果。

版本差异

目前只收录了一个版本。收录下一版后,可以对照标题、作者、分类和摘要。

观测到的版本

相邻记录可能跳过中间版本;首次发现 v2 及以上也会标为版本更新。

v1 · 2026-11-26 02:34 · 最新观测版本

Pinwheel Scheduling is PSPACE-Complete

Pinwheel Scheduling is a classical periodic scheduling problem, receiving as input the deadlines did_i of nn tasks and asking for an infinite schedule with one task per time unit, such that every task ii is scheduled at least once in every did_i time units. Holte, Mok, Rosier, Tulchinsky, and Varvel introduced the problem in 1989 and showed that it lies in \(\PSPACE\). Its exact complexity has been open since then. \(\NP\)-hardness for explicitly listed deadlines was established only recently, and membership in \(\NP\) is open. In this work we prove that Pinwheel Scheduling is \(\PSPACE\)-complete when the deadlines are written in binary. This finally settles the long-standing open question about the complexity of Pinwheel Scheduling. We present a chain of reductions, starting from Periodic 3-SAT, a classical \(\PSPACE\)-complete problem, and using two newly-defined intermediate periodic scheduling problems. These intermediate problems can be seen as periodically assigning tasks to days, with each day containing a fixed number of slots (\emph{hours}) in which tasks are scheduled. In the first of these problems, each day is additionally allowed to contain \emph{breaks}, that is, hours in which no task can be scheduled.

查看此版本解读 →查看此版本原文 ↗