跳到正文
研踪PaperTrail

YOUR RESEARCH, IN SIGHT

让下一篇重要论文,不再错过。

覆盖计算机全学科,以 AI 为快捷入口。关注方向、作者和关键词,把发现变成持续的研究积累。

部分采集异常
正在读取账号与研究记录…

全站更新概况

+0新增论文
+0其中 AI 相关
+0已有论文修订
+100新增 AI 导读

arXiv 最近完成扫描:2026-11-09 07:12 · 全站最近入库:2026-11-08 06:02各信源进度 →

统计口径与数据新鲜度

统计 2026-11-08 09:01 — 2026-11-09 09:01(北京时间) · 点击数字查看对应简报;AI 相关包含在新增论文内。

最近完成检查:2026-11-09 07:12最近发现新增版本:2026-11-08 06:02库内论文最新更新时间:2026-11-06 02:59

每分钟刷新已保存的数据。空检查不代表采集异常;新收录可能包含历史论文。AI 导读按新增版本计数。

17,100 已收录论文14,661 AI 相关4,057 有修订112 HF 社区发现

浏览论文库

时间范围跟随排序:版本更新、本站收录或首次发表。最新收录可能包含历史论文。部分信源异常,查看状态 →

找到 1 篇论文 · 按版本更新时间排序上轮扫描起点 2026-11-09 07:10(北京时间)
新论文 · v1arXiv:2610.35601

Whole-Route Planning of a Memory Bus Between Two BGAs: An Exact Model of Crossings and Layer Changes, Negotiated to DRC-Clean Copper

Andrew Haas

原文摘要

Routing the bus between a processor and its DRAM remains largely manual in printed circuit board (PCB) design, and published algorithms optimize proxies such as crossing or layer counts. We present a router that plans every lane of a two-layer BGA-to-BGA bus before any copper is laid, and carries the plan to design-rule-clean copper. Its core is an exact constraint-programming model that chooses, for all lanes at once, where each necessary crossing occurs, in what order -- by a rule over every triple of lanes -- and where each lane changes layer, with via room; for the ends it is given, it proves its plan optimal within the model. The model reads naturally as physics: worldlines, frustrated Ising spins and contact forces. A linear program places the lanes in millimeters; the constraints it must violate return to the model as cuts, and audit findings as negotiated congestion prices, until the plan passes an audit against the production router's rules or lays clean. The escapes are chosen by an estimate of the same objective, and differential pairs carry their polarity, with an automatic via crossover where the ends disagree. On an Allwinner H3 and a Zynq-7020, each to a DDR3 device, the router completes every rung of two ladders, of up to 51 nets on the H3 (its whole bus) and 43 on the Zynq, connected and DRC-clean, never with more vias than the human designer (80 against 88 and 62 against 100 at the top rungs) and always with less copper, where the toolkit's production router leaves nets open on four of the ten rungs and Freerouting completes none. On the Zynq board itself it completes 45 of the bus's nets with 70 vias to the designer's 105. On generated buses of three, four and six routing layers every run completes, and every one with a known optimum attains it.

cs.AR