跳到正文
研踪PaperTrail

YOUR RESEARCH, IN SIGHT

让下一篇重要论文,不再错过。

覆盖计算机全学科,以 AI 为快捷入口。关注方向、作者和关键词,把发现变成持续的研究积累。

部分采集异常
正在读取账号与研究记录…

全站更新概况

+1072新增论文
+845其中 AI 相关
+94已有论文修订
+100新增 AI 导读

arXiv 最近完成扫描:2026-11-09 16:31 · 全站最近入库:2026-11-09 13:22各信源进度 →

统计口径与数据新鲜度

统计 2026-11-08 18:00 — 2026-11-09 18:00(北京时间) · 点击数字查看对应简报;AI 相关包含在新增论文内。

最近完成检查:2026-11-09 16:31最近发现新增版本:2026-11-09 13:22库内论文最新更新时间:2026-11-07 02:59

每分钟刷新已保存的数据。空检查不代表采集异常;新收录可能包含历史论文。AI 导读按新增版本计数。

18,172 已收录论文15,506 AI 相关4,527 有修订112 HF 社区发现

浏览论文库

时间范围跟随排序:版本更新、本站收录或首次发表。最新收录可能包含历史论文。部分信源异常,查看状态 →

找到 1 篇论文 · 按版本更新时间排序上轮扫描起点 2026-11-09 16:29(北京时间)
新论文 · v1arXiv:2611.04425

Minimizing Bottleneck Overload Risk in Online Edge Task Placement under Workload Uncertainty

Lei Wang, Winston K. G. Seah, Gang Xu, Xiaodong Xu, Baoqi Huang

原文摘要

In edge computing, tasks must be placed on servers of finite capacity before workloads are realized, often with only workload means and variances known. An assignment balanced on expected load can still leave a server with more fluctuations than its residual capacity can absorb. Per-server risk constraints can enforce a prescribed overload tolerance but do not distinguish the assignments that meet it by how close the riskiest server comes to the limit. We show that, for independent tasks, placement preserves a period's total variance and total residual capacity, and decides only how fluctuation, measured by standard deviation, is paired with residual capacity across servers. The risk ratio, the ratio of fluctuation to residual capacity, parameterizes a server's worst-case overload probability over all aggregate workload distributions with given mean and variance. We minimize the largest risk ratio, attained at the risk bottleneck. Risk-Bottleneck Placement (RBP) places tasks in descending order of standard deviation, each on the server with the smallest post-assignment risk ratio, and refines the assignment with relocations and swaps within a finite per-period online budget. On small instances solved exactly by enumerating every assignment, minimizing the maximum expected utilization leaves the largest risk ratio 25.66-29.19% above its exact minimum on average, even with risk-minimizing tie-breaking, and the corresponding gap for RBP is 1.77-2.64%. In trace-derived multi-period simulations at two workload pressures, RBP reduces the worst-server overload probability by 26.0% and 18.0% relative to the best baseline and remains the lowest at every tested pressure and scale.

cs.DC