跳到正文
研踪PaperTrail

YOUR RESEARCH, IN SIGHT

让下一篇重要论文,不再错过。

覆盖计算机全学科,以 AI 为快捷入口。关注方向、作者和关键词,把发现变成持续的研究积累。

部分采集异常
正在读取账号与研究记录…

全站更新概况

+3054新增论文
+2759其中 AI 相关
+88已有论文修订
+100新增 AI 导读

arXiv 最近完成扫描:2026-11-06 00:46 · 全站最近入库:2026-11-05 12:13各信源进度 →

统计口径与数据新鲜度

统计 2026-11-05 01:44 — 2026-11-06 01:44(北京时间) · 点击数字查看对应简报;AI 相关包含在新增论文内。

最近完成检查:2026-11-06 00:46最近发现新增版本:2026-11-05 12:13库内论文最新更新时间:2026-11-05 02:59

每分钟刷新已保存的数据。空检查不代表采集异常;新收录可能包含历史论文。AI 导读按新增版本计数。

15,949 已收录论文13,765 AI 相关3,571 有修订112 HF 社区发现

浏览论文库

时间范围跟随排序:版本更新、本站收录或首次发表。最新收录可能包含历史论文。部分信源异常,查看状态 →

找到 1 篇论文 · 按版本更新时间排序上轮扫描起点 2026-11-06 00:44(北京时间)
新论文 · v1arXiv:2611.04454

Trustworthiness as a Measurement Structure for Task Conformance in 6G Service Chains

Bin Han, Xintong Ling, Muxia Sun, Hans D. Schotten

A 6G service crosses a chain of stages from different vendors, and its contract binds class-conditioned guarantees at the terminal interface: in the packet relay chain studied here, a priority class is owed a timely-delivery rate and a loss ceiling. We define trustworthiness as conformance of the delivered per-class distribution of outcomes to the contract and develop the measurement structure this forces. Two results fix its form: a discrepancy that treats outcomes interchangeably cannot express contract preferences, and no single expectation-valued score that determines the contracted terminal expectations can be carried from stage to stage once two or more contracted indicators remain independent at some stage. The minimal record is one signed number per independent contracted indicator, which the downstream design data carry to the terminal exactly; classical scalar trust models are the single-indicator case. The terminal deviation splits exactly into per-stage contributions. Transition logs at a stage estimate its contribution without reconstructing its full deployed behavior, a stage at its design behavior is flagged at most at a declared rate whatever traffic it receives, and the estimates bracket each stage's share of the terminal deviation at explicit confidence. In the three-relay chain, a relay that either deprioritizes premium traffic or has degraded capacity violates the same clause with identical contracted evidence: the transition audit localizes the relay in 300 of 300 windows and brackets its share of the deviation, and a diagnostic separates the causes.

尚无 AI 解读,展示原文摘要

cs.PF
arXiv ↗PDF ↗