跳到正文
研踪PaperTrail

YOUR RESEARCH, IN SIGHT

让下一篇重要论文,不再错过。

覆盖计算机全学科,以 AI 为快捷入口。关注方向、作者和关键词,把发现变成持续的研究积累。

采集已暂停
正在读取账号与研究记录…

全站更新概况

+0新增论文
+0其中 AI 相关
+0已有论文修订
+0新增 AI 导读

arXiv 最近完成扫描:等待完成 · 全站最近入库:2026-11-02 00:39各信源进度 →

统计口径与数据新鲜度

统计 2026-11-03 14:36 — 2026-11-04 14:36(北京时间) · 点击数字查看对应简报;AI 相关包含在新增论文内。

最近完成检查:尚未完成最近发现新增版本:2026-11-02 00:39库内论文最新更新时间:2026-10-30 01:59

每分钟刷新已保存的数据。空检查不代表采集异常;新收录可能包含历史论文。AI 导读按新增版本计数。

8,677 已收录论文7,675 AI 相关1,866 有修订112 HF 社区发现

浏览论文库

时间范围跟随排序:版本更新、本站收录或首次发表。最新收录可能包含历史论文。

找到 2 篇论文 · 按版本更新时间排序等待首次采集
新论文 · v1arXiv:2610.38225

FACTS-MAS: A Multi-Agent Architecture for Adaptive Forecasting from Heterogeneous Evidence

Madumita Karthikeyan, Umang Rajnikant Bid, Rong Pan

Real-world forecasting often requires integrating heterogeneous evidence whose predictive value varies across horizons, operating regimes, and domains. We introduce FACTS-MAS, a domain-agnostic multi-agent forecasting framework that decomposes evidence into specialized channels for temporal dynamics, exogenous context, seasonality, structural information, and discrete events. Each agent generates an independently testable forecast through a common interface, while leakage-safe historical validation measures its predictive skill relative to a naive reference. These skill estimates are used to weight and combine agent forecasts, so that uninformative evidence is either removed or downweighted rather than forced to participate. A calibration procedure selects domain-specific constant means based on historical validation folds. We evaluate FACTS-MAS on weekly for-sale housing inventory from Zillow and weekly unemployment insurance claims from FRED, for 15 U.S. metropolitan areas at 4-, 8-, and 13-week forecasting horizons. Our method outperforms both a naive last-value forecast method and the TimesFM foundation model. However, a factor-adjusted exponential smoothing model performs as well as the fused forecast. The evidence therefore supports FACTS-MAS as a systematic protocol for testing, calibrating, and recomposing evidence channels before assembling them into the strongest single model for a specific application domain. Code, data, and results are available at https://github.com/Madumita24/FACTS-MAS.

尚无 AI 解读,展示原文摘要

cs.AI · stat.AP
arXiv ↗PDF ↗
新论文 · v1arXiv:2610.36603

A Fine-Grained Empirical Study of Upstream Security Events and Downstream Mitigation in Maven

Kazi Amit Hasan, Enrong Pan, Yuan Tian, Mariam Guizani, Steven H. H. Ding

Open-source vulnerability mitigation spans upstream libraries and the downstream projects that depend on them. Upstream, a vulnerability progresses through a public report when one exists, a fix, a fixed release, and NVD disclosure. Downstream, a project mitigates it by adopting the fixed release, and the timeliness of this adoption is measured relative to these events. Prior work studies the two sides separately, so it is unclear whether downstream exposure stems from delayed upstream release, delayed downstream adoption, or both. We address this gap by following 832 CVEs in the Maven ecosystem from the upstream fix to its adoption by each exposed downstream project. We classify upstream fixes as \textit{silent} or \textit{transparent}, recover the order of report, fix, release, and NVD disclosure, and link vulnerable artifacts to their downstream dependents. We then compare this order with downstream adoption and dependabot usage. We find that delay arises on both sides. Upstream, the fixed release comes before NVD disclosure for about 82\% of CVEs, for both silent and transparent fixes. For the other 17.9\%, downstream projects have no fix to adopt for days to more than four months after disclosure. Downstream, exposure is concentrated, with the top 10\% of CVEs accounting for 72.1\% of it. Of 1,677 observed adoptions, 85.3\% happen after NVD disclosure, rising to 88.3\% for silent fixes released before disclosure. Most adoptions come through routine dependency updates. Adoptions with dependabot version updates have a median release-to-adoption delay of 10.4 days, compared with 110.6 days without dependabot. Yet version updates were configured at adoption time for only 8.5\% of total adoptions. We translate these findings into implications for upstream maintainers, downstream developers, and dependency-automation tools.

尚无 AI 解读,展示原文摘要

cs.SE
arXiv ↗PDF ↗