跳到正文
研踪PaperTrail

YOUR RESEARCH, IN SIGHT

让下一篇重要论文,不再错过。

覆盖计算机全学科,以 AI 为快捷入口。关注方向、作者和关键词,把发现变成持续的研究积累。

采集已暂停
正在读取账号与研究记录…

全站更新概况

+0新增论文
+0其中 AI 相关
+0已有论文修订
+0新增 AI 导读

arXiv 最近完成扫描:等待完成 · 全站最近入库:2026-11-02 00:39各信源进度 →

统计口径与数据新鲜度

统计 2026-11-03 15:25 — 2026-11-04 15:25(北京时间) · 点击数字查看对应简报;AI 相关包含在新增论文内。

最近完成检查:尚未完成最近发现新增版本:2026-11-02 00:39库内论文最新更新时间:2026-10-30 01:59

每分钟刷新已保存的数据。空检查不代表采集异常;新收录可能包含历史论文。AI 导读按新增版本计数。

8,677 已收录论文7,675 AI 相关1,866 有修订112 HF 社区发现

浏览论文库

时间范围跟随排序:版本更新、本站收录或首次发表。最新收录可能包含历史论文。

找到 2 篇论文 · 按版本更新时间排序等待首次采集
新论文 · v1arXiv:2610.39126

Actuator-Aware Observer Inputs for Cascade ADRC of Quadrotors Under Rotor Lag, Measurement Delay and Sensor Noise

Xuan-Quy Dao, Ngoc-Bich Le, Le-Minh Nguyen

In sampled cascade linear active disturbance rejection control (LADRC) of quadrotors, the extended-state observer typically receives the instantaneous command, although the delayed measurement reflects an earlier, rotor-filtered acceleration. This paper proposes actuator-aware (AA) observer inputs: altitude and attitude observers use limited virtual inputs filtered by an assumed rotor model and aligned with the measurement delay, and horizontal observers use acceleration reconstructed from measured attitude. Fixed gains are selected on the discrete-time model under sensitivity and step-response requirements and stationary covariance ceilings on each channel's control variance and increment and on the noise-induced inner-loop increment of the full cascade. In paired set-point trials, PID-Budget, AA-Budget and AA-HalfGain reach mean RMSEs of 65.5, 19.2 and 16.9~mm; under a stricter common cascade ceiling, the AA designs reach 29.9 and 26.4~mm versus 72.3~mm for a PID that uses roughly double their rotor-command increment. PX4 software-in-the-loop runs reproduce these results. Behind EKF2, a noise model fitted to the estimation errors predicts the roll/pitch and yaw increments within 5\% on held-out and out-of-sample runs and the total rotor-command increment within 14\%. Redesigned for this stack under the same sensitivity and response specification and estimator-aware ceilings, AA-Budget-E reduces the set-point RMSE from 59.1~mm (PID-E) to 44.0~mm with a lower rotor-command increment in every paired set-point and lemniscate run (mean S6 rotor-command-increment reductions relative to PID-E: 45\% before and 15\% after output quantization); AA-HalfGain-E beats PID-E only on the lemniscate. The evidence is simulation-based, and the ceilings are nominal tuning constraints.

尚无 AI 解读,展示原文摘要

cs.RO
arXiv ↗PDF ↗
新论文 · v1arXiv:2610.35165

How Tuning, Reference Preview, Actuator Modeling, and Fallback Policies Change Quadrotor Controller Comparisons: A Reproducible Simulation Study

Xuan-Quy Dao, Le-Minh Nguyen, Ngoc-Bich Le

Quadrotor controller comparisons commonly report a single tracking error, although the resulting ranking also depends on tuning effort, reference information, actuator prediction, optimizer fallback, and command timing. We quantify these effects for cascade PID, hover LQR, boundary-layer sliding-mode control (BL-SMC), linear MPC with LQR fallback (LMPC-F), a preview-enabled LMPC-F, and a geometric $SO(3)$ controller on a common nonlinear plant with rotor gyroscopic coupling, motor lag, and saturation. A primary study (556 episodes at 50~Hz) combines matched twelve-candidate tuning, 400 paired evaluation episodes, and a 48-cell MPC factorial; a confirmation study (1462 episodes) repeats the evaluation on 50 fresh realizations with tuning budgets of 12, 24, and 48 candidates. A matched twelve-candidate tuning protocol changed the mean-RMSE ordering obtained with the fixed baseline settings, moving BL-SMC from last to first; the new ordering recurred on the fresh realizations, and a 48-candidate budget left it unchanged. Reference preview substantially reduced MPC tracking error and, on the figure-eight task, removed fallback activity. On an abrupt step, the outcome depended on the interplay between fallback policy, predictor, and actuator authority. Command timing also changed the outcome: replaying measured command-call delays terminated three of four nominal MPC configurations on a desktop computer and all four on a Raspberry Pi~5, whereas capping the solver at 100 iterations removed every deadline miss in the tested nominal timing profiles. Controller rankings therefore depend not only on tracking accuracy but also on the tuning protocol, reference information, fallback behavior, and implementation timing. We propose a reporting checklist covering tracking accuracy, tuning effort, completion and failure rates, fallback activity, applied-input variation, and command timing.

尚无 AI 解读,展示原文摘要

cs.RO
arXiv ↗PDF ↗