跳到正文
研踪PaperTrail
← 研踪 PaperTrail

arXiv:2611.03381 · v1

A Geometry-Informed Neural Operator surrogate of LISFLOOD-FP for rapid pluvial-fluvial flood forecasting: the case of Forlì, Italy

首次提交 2026-11-03 00:22
版本更新 2026-11-03 00:22
雷达观测 2026-11-04 23:41
arXiv ↗PDF ↗

摘要

Physically based two-dimensional hydraulic models are too slow for real-time inundation forecasting and large ensembles. We present a time-dependent geometry-informed neural operator (GINO) surrogate of LISFLOOD-FP for the municipality of Forlì (Italy), severely affected by the May 2023 Emilia-Romagna floods. The surrogate is designed for an operational setting in which only river stage gauges and rain gauges are available. A reproducible pipeline turns public regional observations into a physically based training set: each river inflow is driven by the first stage gauge downstream of it through a calibrated water-surface boundary condition, and rain enters as SCS-CN effective rainfall. The surrogate is an autoregressive GINO trained on 216 simulations of 24 observed events with scaled forcing. It predicts volume-conserving polygon-mean depths on an exposure-based Voronoi mesh of 659 nodes, with a 20 min step over 72 h. The surrogate is tested on 38 independent observed events that it never saw during training. On these events it reaches a critical success index (CSI) of 0.934 at 0.05m and 0.844 at 0.3 m, a depth RMSE of 0.008m and an $R^2$ of 0.984 for maximum-depth maps. On one NVIDIA A10G GPU a 72-h forecast takes 1.7 s instead of 55 s with LISFLOOD-FP, and a 50-member ensemble, computed in a single batched rollout, takes 6.2 s instead of about 46 min, which makes probabilistic flood forecasting practical. These results show that neural-operator surrogates can deliver accurate pluvial-fluvial flood forecasts driven by river stage for operational early warning.

作者备注:16 pages, 12 figures, 3 tables

AI 论文解读

基于摘要 · 非全文审阅

此版本尚未生成 AI 解读。解读由后台任务生成并按论文版本保存,登录后共享已有结果。

版本差异

目前只观测到一个版本,无法比较变化。之后收录新版本时,会在这里对照标题、作者、分类和摘要。

观测到的版本

相邻记录可能跳过中间版本;首次发现 v2 及以上也会标为版本更新。

v1 · 2026-11-03 00:22 · 最新观测版本

A Geometry-Informed Neural Operator surrogate of LISFLOOD-FP for rapid pluvial-fluvial flood forecasting: the case of Forlì, Italy

Physically based two-dimensional hydraulic models are too slow for real-time inundation forecasting and large ensembles. We present a time-dependent geometry-informed neural operator (GINO) surrogate of LISFLOOD-FP for the municipality of Forlì (Italy), severely affected by the May 2023 Emilia-Romagna floods. The surrogate is designed for an operational setting in which only river stage gauges and rain gauges are available. A reproducible pipeline turns public regional observations into a physically based training set: each river inflow is driven by the first stage gauge downstream of it through a calibrated water-surface boundary condition, and rain enters as SCS-CN effective rainfall. The surrogate is an autoregressive GINO trained on 216 simulations of 24 observed events with scaled forcing. It predicts volume-conserving polygon-mean depths on an exposure-based Voronoi mesh of 659 nodes, with a 20 min step over 72 h. The surrogate is tested on 38 independent observed events that it never saw during training. On these events it reaches a critical success index (CSI) of 0.934 at 0.05m and 0.844 at 0.3 m, a depth RMSE of 0.008m and an $R^2$ of 0.984 for maximum-depth maps. On one NVIDIA A10G GPU a 72-h forecast takes 1.7 s instead of 55 s with LISFLOOD-FP, and a 50-member ensemble, computed in a single batched rollout, takes 6.2 s instead of about 46 min, which makes probabilistic flood forecasting practical. These results show that neural-operator surrogates can deliver accurate pluvial-fluvial flood forecasts driven by river stage for operational early warning.

查看此版本解读 →查看此版本原文 ↗