← 研踪 PaperTrailarXiv:2611.22038 · v1
GP--RL--MPC: Uncertainty-Aware Reinforcement Learning-Augmented Model Predictive Control with Gaussian Process Postdecision State-Value Functions
首次提交 2026-11-17 08:59
版本更新 2026-11-17 08:59
雷达观测 2026-11-18 19:43
摘要
We propose Gaussian Process Reinforcement Learning-Augmented Model Predictive Control (GP--RL--MPC), which uses a learned critic as the MPC terminal penalty to account for costs beyond the prediction horizon. Gaussian process regression (GPR) enables data-efficient critic learning from limited, noisy rollouts within optimistic approximate policy iteration (OAPI), with soft updates mitigating policy chattering. A tunable risk coefficient weights GP epistemic uncertainty in the terminal cost, regulating sensitivity to uncertain critic predictions. The postdecision state formulation shifts disturbance averaging offline to account for aleatoric uncertainty from the terminal transition onward. Under matching objectives and admissible actions, a one-step horizon recovers greedy value-space RL. After fitting GP hyperparameters by exact marginal likelihood, we construct a sparse deterministic training conditional (DTC) posterior using inducing points selected by pivoted Cholesky (PC), reducing online evaluation costs as the training dataset grows. In a continuous stirred-tank reactor (CSTR) subject to exogenous disturbances, GP--RL--MPC with an appropriately selected risk coefficient and policy screening reduces the sum of squared errors (SSE) by an average of 80.52% relative to an otherwise matched baseline MPC across five random seeds (sample standard deviation: 3.48%).
作者备注:19 pages including references and appendices, 3 figures, 2 tables. Submitted to L4DC 2027
观测到的版本
相邻记录可能跳过中间版本;首次发现 v2 及以上也会标为版本更新。
v1 · 2026-11-17 08:59 · 最新观测版本
GP--RL--MPC: Uncertainty-Aware Reinforcement Learning-Augmented Model Predictive Control with Gaussian Process Postdecision State-Value Functions
We propose Gaussian Process Reinforcement Learning-Augmented Model Predictive Control (GP--RL--MPC), which uses a learned critic as the MPC terminal penalty to account for costs beyond the prediction horizon. Gaussian process regression (GPR) enables data-efficient critic learning from limited, noisy rollouts within optimistic approximate policy iteration (OAPI), with soft updates mitigating policy chattering. A tunable risk coefficient weights GP epistemic uncertainty in the terminal cost, regulating sensitivity to uncertain critic predictions. The postdecision state formulation shifts disturbance averaging offline to account for aleatoric uncertainty from the terminal transition onward. Under matching objectives and admissible actions, a one-step horizon recovers greedy value-space RL. After fitting GP hyperparameters by exact marginal likelihood, we construct a sparse deterministic training conditional (DTC) posterior using inducing points selected by pivoted Cholesky (PC), reducing online evaluation costs as the training dataset grows. In a continuous stirred-tank reactor (CSTR) subject to exogenous disturbances, GP--RL--MPC with an appropriately selected risk coefficient and policy screening reduces the sum of squared errors (SSE) by an average of 80.52% relative to an otherwise matched baseline MPC across five random seeds (sample standard deviation: 3.48%).
查看此版本解读 →查看此版本原文 ↗