← 研踪 PaperTrailarXiv:2611.30179 · v1
Trustworthy agentic lunar robotics: safety-constrained contingent planning with a foundation-model planner
首次提交 2026-11-23 15:24
版本更新 2026-11-23 15:24
雷达观测 2026-11-24 13:48
摘要
Sustained lunar-base operations require robots that restore equipment and deliver cargo under conditions unforeseen before deployment. Flown space autonomy executes pre-validated procedures and enters a safe hold outside their scope, whereas foundation models synthesize plans on site that cannot be verified before execution. We formulate these operations as safety-constrained contingent planning with irreversible actions, erroneous records, three-valued physical evidence, and costly, deadline-constrained sensing. We propose asymmetric knowledge-level replanning (AKR), which treats the planner as an untrusted black box: reversible actions run on the planner's assumptions, and irreversible actions run only after a minimum-cost sensing cover verifies every precondition. Under sound measurements, no irreversible action executes on a false precondition for any planner or record, the sensing cost before an irreversible action is bounded below for every sound knowledge-based policy, and execution with a complete planner ends in a verified goal or a certified hold. AKR executed no hazardous action in 21,000 Monte Carlo trials with sound observations or in 58 full-stack runs; the FF-Replan acting rule executed one in 7% of those trials. The median AKR run took 1.10 times the fastest run on the same mission, against 1.50 under the K-replanner acting rule. AKR completed 20 of 21 contingency and sequential-fault runs with an unchanged task model; the original PLEXIL and EUROPAPLEXIL procedures completed none.
观测到的版本
相邻记录可能跳过中间版本;首次发现 v2 及以上也会标为版本更新。
v1 · 2026-11-23 15:24 · 最新观测版本
Trustworthy agentic lunar robotics: safety-constrained contingent planning with a foundation-model planner
Sustained lunar-base operations require robots that restore equipment and deliver cargo under conditions unforeseen before deployment. Flown space autonomy executes pre-validated procedures and enters a safe hold outside their scope, whereas foundation models synthesize plans on site that cannot be verified before execution. We formulate these operations as safety-constrained contingent planning with irreversible actions, erroneous records, three-valued physical evidence, and costly, deadline-constrained sensing. We propose asymmetric knowledge-level replanning (AKR), which treats the planner as an untrusted black box: reversible actions run on the planner's assumptions, and irreversible actions run only after a minimum-cost sensing cover verifies every precondition. Under sound measurements, no irreversible action executes on a false precondition for any planner or record, the sensing cost before an irreversible action is bounded below for every sound knowledge-based policy, and execution with a complete planner ends in a verified goal or a certified hold. AKR executed no hazardous action in 21,000 Monte Carlo trials with sound observations or in 58 full-stack runs; the FF-Replan acting rule executed one in 7% of those trials. The median AKR run took 1.10 times the fastest run on the same mission, against 1.50 under the K-replanner acting rule. AKR completed 20 of 21 contingency and sequential-fault runs with an unchanged task model; the original PLEXIL and EUROPAPLEXIL procedures completed none.
查看此版本解读 →查看此版本原文 ↗