跳到正文
研踪PaperTrail

论文库

检索计算机领域论文,按研究方向、作者或关键词筛选。

部分采集异常
正在读取账号与研究记录…

全站更新概况

+2347新增论文
+1886其中 AI 相关
+281已有论文修订
+0新增 AI 导读

arXiv 最近完成扫描:2026-11-25 05:07 · 全站最近入库:2026-11-25 01:09各信源进度 →

统计口径与数据新鲜度

统计 2026-11-24 06:03 — 2026-11-25 06:03(北京时间) · 点击数字查看对应简报;AI 相关包含在新增论文内。

最近完成检查:2026-11-25 05:07最近发现新增版本:2026-11-25 01:09库内论文最新更新时间:2026-11-24 02:59

每分钟刷新已保存的数据。空检查不代表采集异常;新收录可能包含历史论文。AI 导读按新增版本计数。

31,932 已收录论文26,401 AI 相关10,039 有修订112 HF 社区发现

浏览论文库

时间范围跟随排序:版本更新、本站收录或首次发表。最新收录可能包含历史论文。部分信源异常,查看状态 →

找到 1 篇论文 · 按版本更新时间排序上轮扫描起点 2026-11-25 05:05(北京时间)
新论文 · v1arXiv:2611.30179

Trustworthy agentic lunar robotics: safety-constrained contingent planning with a foundation-model planner

Bingqi Huang, Bingchuan Wei, Yingkai Cai, Zhaokui Wang

原文摘要

Sustained lunar-base operations require robots that restore equipment and deliver cargo under conditions unforeseen before deployment. Flown space autonomy executes pre-validated procedures and enters a safe hold outside their scope, whereas foundation models synthesize plans on site that cannot be verified before execution. We formulate these operations as safety-constrained contingent planning with irreversible actions, erroneous records, three-valued physical evidence, and costly, deadline-constrained sensing. We propose asymmetric knowledge-level replanning (AKR), which treats the planner as an untrusted black box: reversible actions run on the planner's assumptions, and irreversible actions run only after a minimum-cost sensing cover verifies every precondition. Under sound measurements, no irreversible action executes on a false precondition for any planner or record, the sensing cost before an irreversible action is bounded below for every sound knowledge-based policy, and execution with a complete planner ends in a verified goal or a certified hold. AKR executed no hazardous action in 21,000 Monte Carlo trials with sound observations or in 58 full-stack runs; the FF-Replan acting rule executed one in 7% of those trials. The median AKR run took 1.10 times the fastest run on the same mission, against 1.50 under the K-replanner acting rule. AKR completed 20 of 21 contingency and sequential-fault runs with an unchanged task model; the original PLEXIL and EUROPA$\rightarrow$PLEXIL procedures completed none.

cs.RO · cs.AI